Showing the latest 10 filings. Sign in to filter or browse the full history.
Showing 10 of 38 filings.
10 Sept 20261 filing
Meeting Details
- Board meeting scheduled for November 13, 2026; time and venue not disclosed.
Key Agenda Items
- Consider unaudited financial results for quarter ended September 30, 2026.
Other Notes
- Trading window will be closed for directors and designated employees from Sept 15, 2026 to Nov 15, 2026.
7 Aug 20261 filing
Meeting Details
- Date and time: July 31, 2026, during the Q2 earnings call.
- Type and mode: group, virtual earnings conference call.
- Event/organiser: ABB India Limited.
Participants
- MD, Managing Director Designate (effective Jan 1, 2027).
- CFO, Chief Financial Officer.
- President, Electrification Products.
- President, Electrification Distribution Solutions.
- President, Energy Industries Division Automation.
Purpose
- Discuss Q2 unaudited results and transition plans; investor Q&A.
Additional Notes
- Transcript of the concall enclosed and posted on ABB India website.
- Conference recording will be available on company and service websites.
31 Jul 20263 filings
Meeting Details
- Date: July 31, 2026; Time: 6:30 pm IST; Analyst/investor call; virtual; Organiser: ABB India Ltd.
Participants
- Company Secretary & Compliance Officer to participate; senior management expected as presenters.
Purpose
- Discuss Q2 CY2026 unaudited results for quarter ended June 30, 2026.
Additional Notes
- Presentation to be uploaded on ABB India website; no links included.
Key financials
- Q2 orders up 50% to INR 4,363 crore.
- H1 2026 orders total INR 8,643 crore, up 36%.
- Q2 revenue INR 3,559 crore, up 21% year-on-year.
- H1 2026 revenue INR 6,743 crore, up 13%.
- Profit after tax Q2: INR 370 crore, up 8%.
- Operational EBITA Q2: INR 461 crore; margin 13.0%.
- PBT Q2: INR 499 crore; H1: INR 961 crore.
- EPS Q2: INR 17.46; H1: INR 33.61.
- Special dividend of INR 90 per equity share.
- Q2 end backlog: INR 11,898 crore, up 22%.
Operational & sustainability
- Waste diversion 99.7% from landfill in H1 2026.
- Scope 1+2 emissions down ~85% vs 2019 baseline.
- CRISIL ESG rating improved from 64 to 67.
- Business Today awards: India's Most Sustainable Company in Capital Goods.
- AWS certification for Peenya facility; water stewardship with ~40 Bengaluru suppliers.
Outlook & commentary
- Outlook: India's capex cycle remains structurally favorable through H2 CY2026.
- Demand supported by electrification, automation and digitalization.
- Near-term margins subject to commodity costs and currency movements.
No brief for this announcement.This type of announcement aren’t summarised. View the original using the link below
27 Jun 20261 filing
Appointment
- Appointment of Mr. Hemanth Kumar as Local Division Manager – MOTR and SMP, effective July 1, 2026.
- Term of appointment: Not Applicable.
24 Jun 20261 filing
Deployment details
- Kolkata Metro adopts ABB electrification and motion-control solutions across stations and tunnels.
- 72-km network runs 300+ trains daily and serves over 0.5 million passengers.
- ABB solutions include low-/medium-voltage gas-insulated switchgear and VFDs across corridors.
- Energy savings average 25% from HVAC and control systems.
- 25-year ABB-Kolkata Metro alliance supports efficiency and safety.
Operational and strategic context
- Solutions deployed at Sealdah–Phoolbagan, Joka–Majerhat, and other corridors.
- Local manufacturing under Make in India strengthens supply resilience.
- ABB notes its technology is used in 80% of India’s metro networks.
25 Mar 20261 filing
No brief for this announcement.This type of announcement aren’t summarised. View the original using the link below
15 Mar 20261 filing
No brief for this announcement.This type of announcement aren’t summarised. View the original using the link below
9 Mar 20261 filing
Investment and Expansion Plans
- ABB India plans a $75 million investment in 2026 to expand manufacturing and R&D capabilities.
- The investment supports Electrification, Motion, Automation business growth, and local-for-local strategy.
- ABB invested over $35 million in India in 2025 and $230 million over the past decade.
Facility Upgrades and Capex
- Bengaluru Nelamangala campuses receive $14 million to expand converter manufacturing and power protection production.
- Peenya facility gets $21 million to increase low-voltage drives and specialized motor manufacturing capacity.
- Hyderabad investment of $12 million includes new office, labs, and a High Power lab for R&D.
- Nashik facility expands with $22 million for circuit breakers, Vacuum Interrupter factory, and SF6-free technology localization.
- Vadodara receives $6 million to scale synchronous generators, induction motors, and expand services and training.
Financial Performance
- ABB India’s 2025 revenue exceeded $1.5 billion, about 4% of ABB Group’s total revenue.
Operations and Workforce
- ABB India operates five locations with nearly 25 manufacturing and distribution facilities plus five major R&D centers.
- Approximately 300 new skilled jobs will be created in engineering, operations, and research.