Showing the latest 10 filings. Sign in to filter or browse the full history.
10 of 31 filings·Updated 21 Aug 2026
Showing 10 of 31 filings.
21 Aug 20261 filing
Company UpdateGeneral

First container trial train arrives at Gati Shakti Terminal, signaling end-to-end rail logistics milestone

Milestone: container trial train arrival

  • On August 20, 2026, the first container trial train reached the Gati Shakti Terminal in Kachchh, Gujarat.
  • The terminal is commissioned by KMT Engineering Pvt. Ltd., a subsidiary of Kalyani Cast Tech.
  • Containers transported were manufactured at the Rewari plant, demonstrating end-to-end capabilities.
  • Supports development of an integrated, efficient, sustainable rail freight and logistics ecosystem.
  • Strengthens capabilities in container manufacturing, wagon manufacturing, cargo handling and rail logistics.
Filed 15:17View Source
19 Aug 20261 filing
Company UpdateGeneral

Kalyani Cast Tech receives provisional Gujarat registration for Private Freight Terminal under Policy 2021

Private Freight Terminal registration

  • Registration granted by Industries Commissionerate, Gujarat, for a Private Freight Terminal at Shivlakha, Bhachau, Kachchh.
  • Total project cost ₹110 crore; eligible project cost ₹80 crore.
  • Registration No. IC/0335/08/2026 dated 14 August 2026.
  • Registration is provisional and subject to eligibility conditions and guidelines.
  • Eligible for financial assistance/subsidy under Gujarat policy, subject to eligibility.
  • Location: Shivlakha, Survey No-449, near NH-41, Bhachau, Kachchh, PIN 370145.
  • Land area 233,304 sq m; Buildings, Plant & Machinery, and infrastructure costs outlined.
  • Project total 11,000.0 lakhs; eligible 8,000.00 lakhs.
  • TPQA appointment and compliance with environmental and land regulations required.
Filed 14:55View Source
17 Aug 20261 filing
Company UpdateGeneral

Clarification of Grand Total Shareholding Percentages after Preferential Issue; EGM approval obtained

Shareholding pattern post preferential issue

  • Pre-issue promoter holding: 42,70,750 shares, 59.47%.
  • Post-issue promoter holding: 45,91,373 shares, 61.19%.
  • Pre-issue public holding: 29,09,750 shares, 40.53%.
  • Post-issue public holding: 29,12,250 shares, 38.81%.
  • Total (A+B): 71,80,500 shares pre; 75,03,623 post (100%).
  • Custodian (C): none; Grand Total 100%.
  • EGM held on 28 July 2026; preferential issue approved by Members.
  • Disclosures address Exchange observation regarding missing Percentage of Grand Total.
Filed 15:59View Source
7 Aug 20261 filing
Company UpdateGeneral

Western Railway approves commissioning of KMT Engineering's GCT at Shivlakha KEGS

GCT commissioning at Shivlakha KEGS

  • Western Railway approved commissioning of GCT at Shivlakha (KEGS) station for KMT Engineering Pvt Ltd.
  • Alpha code KEGS and numeric code 08524078 assigned; track capacity CC+8.
  • GCT to operate on non-TDB and non-EOL basis.
  • Commissioning on non-interlocking basis for six months; GCT Agreement to be signed.
  • Freight up to Shivlakha charged on non-through distance basis; beyond Shivlakha, siding charges apply.
  • EIMWB at KEGS pending; weighment via Samkhiali (SIOB) and Adesar (AAR) per movement.
  • FOIS installation pending; Samkhiali SIOB designated as nodal station for TMS; IP address provided.
  • Global Customer Code KMTE; division to complete pending issues and sign GCT Agreement within six months.
  • GCT temporarily opened with non-interlocked connectivity for six months from notification.
Filed 12:34View Source
28 Jul 20261 filing
AGM/EGMEGM

EGM of Kalyani Cast Tech to consider special resolution for preferential issue of convertible warrants

EGM objective

  • Special resolution for preferential issue of up to 3,23,123 convertible equity warrants.

Resolution terms

  • Basis of pricing, objects and proposed allottees to be as per Explanatory Statement.

Voting status

  • Voting results to be declared within prescribed timeline.
Filed 18:08View Source
15 Jul 20261 filing
AGM/EGMEGM

Corrigendum clarifies promoter-group Convertible Equity Warrants for July 28, 2026 EGM.

EGM purpose

  • Corrigendum updates EGM Item No.1 to approve preferential issue of Convertible Equity Warrants to promoter group.

Promoter-group allottees

  • Promoter-group individuals named as Convertible Equity Warrants allottees.

Subscription intent

  • Proposed allottees intend to subscribe to warrants under the issue.

Other participants

  • No other promoter, promoter group, or KMP intends to subscribe.

EGM logistics

  • EGM scheduled July 28, 2026 via VC/OAVM.

Corrigendum availability

  • Corrigendum available on company and BSE websites.

Relation to original notice

  • Corrigendum forms part of the original EGM notice.
Filed 16:40View Source
14 Jul 20261 filing
Company UpdateCertificate under Reg. 74 (5) of SEBI (DP) Regulations, 2018

Certificate under Regulation 74(5) for the quarterly reporting period enclosed

  • Certificate under Regulation 74(5) for the quarterly reporting period enclosed.
Filed 18:50View Source
6 Jul 20261 filing
Company UpdateNewspaper Publication

PFA

Filed 17:56View Source
4 Jul 20261 filing
AGM/EGMEGM

Kalyani Cast Tech seeks approval to issue 3,23,123 convertible warrants at ₹582 each via preferential issue

Purpose

  • Approve issue of 3,23,123 convertible equity warrants on a preferential basis.
  • Warrants priced at ₹582 each, up to ₹18.80 crore.
  • Warrants exercisable into equity shares within 18 months.
  • Allottees include promoter group and one non-promoter.

Resolution details

  • Type: Special resolution for preferential issue of warrants.
  • Number and terms: 3,23,123 warrants at ₹582, convertible into equal shares.
  • Upfront: 25% at subscription; 75% at exercise price; 18-month exercise window.
  • Allottees: promoter group and one non-promoter; total warrants 3,23,123.
  • Rank: pari passu with existing shares; dematerialised; listed on BSE.
  • Lock-in: as per SEBI ICDR; pre-issue holdings also subject to lock-in.
  • Board may modify terms or issue PAS-4 to allottees.
  • Use of proceeds: rail terminal development, working capital, general corporate purposes.
  • Relevant date: price determination on 25 June 2026; post-issue pattern provided.
  • Post-issue shareholding: promoters ~61.19%, public ~38.81%; no control change.

Shareholding impact

  • Promoters and promoter group hold 61.19% post-issue; public 38.81%.
  • No change in control expected from the preferential issue.

Governance and listing

  • No board composition changes anticipated; control remains unchanged.
  • Equity shares upon exercise to be listed on the existing exchanges.
Filed 13:14View Source
30 Jun 20261 filing
Board MeetingOutcome of Board Meeting

Board approves preferential issue of 3,23,123 convertible equity warrants at ₹582; EGM scheduled July 28, 2026.

Warrant issuance terms

  • 3,23,123 convertible equity warrants proposed for issue.
  • Warrants convert into one equity share of face value ₹10.
  • Price ₹582 per warrant, including subscription and exercise.
  • Total issue size ₹18.80 Cr via private preferential allotment.
  • Warrants exercisable within 18 months from allotment.
  • Upfront call of 25% of total issue size from allottees.
  • Issue subject to regulatory approvals and members' approvals.

Meeting and eligibility

  • EGM scheduled at 12:00 PM on 28 July 2026 via video conference.
  • Cut-off date for voting eligibility: 21 July 2026.

Allottees and holdings

  • Seven named allottees for the preferential issue.
  • Post-issue holding range 0.03% to 4.87%.

Other disclosures

  • Details of post-issue allocations and pre-issue holdings in Annexure A.
Filed 18:42View Source
Showing 10 of 31 filings