Showing the latest 10 filings. Sign in to filter or browse the full history.
Showing 10 of 31 filings.
21 Aug 20261 filing
Milestone: container trial train arrival
- On August 20, 2026, the first container trial train reached the Gati Shakti Terminal in Kachchh, Gujarat.
- The terminal is commissioned by KMT Engineering Pvt. Ltd., a subsidiary of Kalyani Cast Tech.
- Containers transported were manufactured at the Rewari plant, demonstrating end-to-end capabilities.
- Supports development of an integrated, efficient, sustainable rail freight and logistics ecosystem.
- Strengthens capabilities in container manufacturing, wagon manufacturing, cargo handling and rail logistics.
19 Aug 20261 filing
Private Freight Terminal registration
- Registration granted by Industries Commissionerate, Gujarat, for a Private Freight Terminal at Shivlakha, Bhachau, Kachchh.
- Total project cost ₹110 crore; eligible project cost ₹80 crore.
- Registration No. IC/0335/08/2026 dated 14 August 2026.
- Registration is provisional and subject to eligibility conditions and guidelines.
- Eligible for financial assistance/subsidy under Gujarat policy, subject to eligibility.
- Location: Shivlakha, Survey No-449, near NH-41, Bhachau, Kachchh, PIN 370145.
- Land area 233,304 sq m; Buildings, Plant & Machinery, and infrastructure costs outlined.
- Project total 11,000.0 lakhs; eligible 8,000.00 lakhs.
- TPQA appointment and compliance with environmental and land regulations required.
17 Aug 20261 filing
Shareholding pattern post preferential issue
- Pre-issue promoter holding: 42,70,750 shares, 59.47%.
- Post-issue promoter holding: 45,91,373 shares, 61.19%.
- Pre-issue public holding: 29,09,750 shares, 40.53%.
- Post-issue public holding: 29,12,250 shares, 38.81%.
- Total (A+B): 71,80,500 shares pre; 75,03,623 post (100%).
- Custodian (C): none; Grand Total 100%.
- EGM held on 28 July 2026; preferential issue approved by Members.
- Disclosures address Exchange observation regarding missing Percentage of Grand Total.
7 Aug 20261 filing
GCT commissioning at Shivlakha KEGS
- Western Railway approved commissioning of GCT at Shivlakha (KEGS) station for KMT Engineering Pvt Ltd.
- Alpha code KEGS and numeric code 08524078 assigned; track capacity CC+8.
- GCT to operate on non-TDB and non-EOL basis.
- Commissioning on non-interlocking basis for six months; GCT Agreement to be signed.
- Freight up to Shivlakha charged on non-through distance basis; beyond Shivlakha, siding charges apply.
- EIMWB at KEGS pending; weighment via Samkhiali (SIOB) and Adesar (AAR) per movement.
- FOIS installation pending; Samkhiali SIOB designated as nodal station for TMS; IP address provided.
- Global Customer Code KMTE; division to complete pending issues and sign GCT Agreement within six months.
- GCT temporarily opened with non-interlocked connectivity for six months from notification.
28 Jul 20261 filing
EGM objective
- Special resolution for preferential issue of up to 3,23,123 convertible equity warrants.
Resolution terms
- Basis of pricing, objects and proposed allottees to be as per Explanatory Statement.
Voting status
- Voting results to be declared within prescribed timeline.
15 Jul 20261 filing
EGM purpose
- Corrigendum updates EGM Item No.1 to approve preferential issue of Convertible Equity Warrants to promoter group.
Promoter-group allottees
- Promoter-group individuals named as Convertible Equity Warrants allottees.
Subscription intent
- Proposed allottees intend to subscribe to warrants under the issue.
Other participants
- No other promoter, promoter group, or KMP intends to subscribe.
EGM logistics
- EGM scheduled July 28, 2026 via VC/OAVM.
Corrigendum availability
- Corrigendum available on company and BSE websites.
Relation to original notice
- Corrigendum forms part of the original EGM notice.
14 Jul 20261 filing
- Certificate under Regulation 74(5) for the quarterly reporting period enclosed.
4 Jul 20261 filing
Purpose
- Approve issue of 3,23,123 convertible equity warrants on a preferential basis.
- Warrants priced at ₹582 each, up to ₹18.80 crore.
- Warrants exercisable into equity shares within 18 months.
- Allottees include promoter group and one non-promoter.
Resolution details
- Type: Special resolution for preferential issue of warrants.
- Number and terms: 3,23,123 warrants at ₹582, convertible into equal shares.
- Upfront: 25% at subscription; 75% at exercise price; 18-month exercise window.
- Allottees: promoter group and one non-promoter; total warrants 3,23,123.
- Rank: pari passu with existing shares; dematerialised; listed on BSE.
- Lock-in: as per SEBI ICDR; pre-issue holdings also subject to lock-in.
- Board may modify terms or issue PAS-4 to allottees.
- Use of proceeds: rail terminal development, working capital, general corporate purposes.
- Relevant date: price determination on 25 June 2026; post-issue pattern provided.
- Post-issue shareholding: promoters ~61.19%, public ~38.81%; no control change.
Shareholding impact
- Promoters and promoter group hold 61.19% post-issue; public 38.81%.
- No change in control expected from the preferential issue.
Governance and listing
- No board composition changes anticipated; control remains unchanged.
- Equity shares upon exercise to be listed on the existing exchanges.
30 Jun 20261 filing
Warrant issuance terms
- 3,23,123 convertible equity warrants proposed for issue.
- Warrants convert into one equity share of face value ₹10.
- Price ₹582 per warrant, including subscription and exercise.
- Total issue size ₹18.80 Cr via private preferential allotment.
- Warrants exercisable within 18 months from allotment.
- Upfront call of 25% of total issue size from allottees.
- Issue subject to regulatory approvals and members' approvals.
Meeting and eligibility
- EGM scheduled at 12:00 PM on 28 July 2026 via video conference.
- Cut-off date for voting eligibility: 21 July 2026.
Allottees and holdings
- Seven named allottees for the preferential issue.
- Post-issue holding range 0.03% to 4.87%.
Other disclosures
- Details of post-issue allocations and pre-issue holdings in Annexure A.