Showing the latest 10 filings. Sign in to filter or browse the full history. View full history
Showing 10 of 26 filings.
20 Aug 2026 1 filing
Incident details
Inadvertent fire at Raw Material Godown in Nadukallur, Tirunelveli, Tamil Nadu.
Incident ongoing; on-site safety personnel coordinating with local fire authorities to extinguish flames.
Production temporarily suspended as a precaution; measures to safeguard personnel and contain losses.
Extent of loss/damage to raw material and infrastructure under assessment.
Insurance coverage confirmed; extent of loss and recovery to be determined.
No human injury reported.
Factory location: S.F. Nos. 143-146, Vaduganpatti Village, Nadukallur to Tirunelveli.
Date of incident: 19 August 2026; filing date: 20 August 2026.
13 Aug 2026 2 filings
Fundraising details
Mode of fund raising: Preferential Issue; date and amounts disclosed in filing.
Monitoring agency: Brickwork Ratings India Private Limited.
Total funds raised and receipts summarized; under-subscription adjustments noted.
No deviation or variation in use of funds raised.
Utilisation and approvals
Audit Committee reviewed the filing; comments: no deviation identified.
Total proceeds revised due to under-subscription; allocations adjusted.
Objects allocated per original plan; no material divergence.
12 Aug 2026 2 filings
Fund-raising details
Preferential issue of equity shares and warrants; total proceeds Rs 104.37 crore; window 28 Jan–3 Feb 2026.
Deviation status
Deviation from objects: No; range of deviation: Not Applicable.
Utilisation status
Proceeds fully utilized as of 31 Mar 2026; 75% to be received at warrant exercise.
Monitoring agency
MA: Brickwork Ratings; report dated 05 Aug 2026.
Revision of cost & allocations
Total issue proceeds revised to Rs 104.37 crore from Rs 107.04 crore due to undersubscription.
Object progress & status
Debt repayment completed; investment in subsidiary ongoing; General Corporate Purposes completed.
Financial results approved
Approved unaudited standalone and consolidated results for quarter ended June 30, 2026, with Limited Review Reports.
Results reviewed by Audit Committee; independent auditors issued unmodified reports.
Auditor remarks and scope
Independent Auditor's Review Report for Q1 2026; no material misstatement observed.
Three subsidiaries not reviewed; management-certified figures deemed not material to the group.
Consolidated results subject to limited review; auditor notes unchanged.
Regulatory disclosures and dates
Board approved the results; filings to BSE under Regulation 33 of SEBI LODR.
Board meeting date: August 12, 2026.
16 Jul 2026 1 filing
Dematerialisation status
Certificate states Regulation 74(5) not applicable; entire holding in demat form; no rematerialisation requests received.
No physical certificates were received for dematerialisation; no mutilation or cancellation required.
There were no dematerialisation/rematerialisation requests during the quarter ended 30 June 2026.
30 Jun 2026 1 filing
Board meeting
Board meeting date to consider unaudited results will be intimated in due course.